Fuchsstadt Wind Farm
The Fuchsstadt wind farm, built by Green City AG as developer and general contractor, is located in Bavaria about 40 km north of Würzburg. The wind farm is scheduled for completion in Q4 2021 and will comprise three wind turbines, each with a capacity of 4.5 megawatts, a hub height of 164 metres and a rotor diameter of 149 metres. The electricity produced by the wind farm will be marketed via a long-term EEG feed-in tariff and will enable the supply of around 8,500 households with clean electricity.
- Country
Germany - Time of investment
2021 - Status
Invested - Sector
Energy – Renewable energies